Our trigeneration projects
Sites in Russia, Belarus and Kazakhstan where Thermax absorption chillers run on heat from on-site generation. This is only part of our work: the company has completed more than 350 major projects for over 1,000 customers.

Tyumen, a 15-story Class A business center: a Thermax absorption chiller on hot water from gas engine waste heat, 12/7 °C…

Minsk, class B1 business center: a 500 kW Thermax LT 18C absorption chiller on heat from two Bosch gas engines, NCT cooling…

Moscow, a historic building: 5 Capstone C200 microturbines and 2 Thermax LT-14 C chillers of 500 kW, assembled from parts in the…

Pushkin, an API plant: 2 Jenbacher J320 gas engines and two 1,430 kW Thermax TAC L5 E3 absorption chillers, water 12/7 °C. In…

A 110 MW associated gas power plant in Aktobe: a Thermax 2D 5M C chiller on gas turbine exhaust, about 3.2 MW of cooling for…

A mushroom complex in Vsevolozhsk: two Thermax 5G 6LH absorption chillers, 3.8 MW in total, on waste hot water, and two NCT VR4…

Two cogeneration units in Gomel Region: Thermax LT 14C (651 kW) and LT 10C (280 kW) absorption chillers on gas engine waste…

Tomsk, a radio electronics plant: a 1.7 MW gas engine and two Thermax 5G 4L C absorption chillers of 1,100 kW. Owner's letter…

Smolensk sports academy: two 1,100 kW Thermax 5G 4L C chillers on boiler house hot water, four MTU gas engines on site. Contract…

Greenhouse complex in Sverdlovsk Region: two 400 kW Thermax LT 12 C absorption chillers on gas engine heat, 8.5/3.5 °C water…

Shopping mall in Saratov: two 2,200 kW Thermax 5G 6L C absorption chillers on gas engine heat. 2014 contract, estimated benefit…

A shopping mall in Kyzylorda: two 1,100 kW Thermax absorption chillers, one on gas engine heat, one with a gas burner, and two…

Fruit concentrate plant in Lobnya: a 1,500 kW Thermax absorption chiller cools propylene glycol to 0 °C for pasteurizers. NCT…

Dairy plant in Vyselki: a 3,500 kW steam-fired Thermax absorption chiller gives water down to 2 °C. Four MTU gas engines. Our…

This Krasnogorsk site was built without Cold Energy and is shown as an example: three Thermax LT 42 T chillers on heat from 4…
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.