Vyborzhets agricultural complex: two hot water absorption chillers, 3.8 MW
In brief. At the Vyborzhets mushroom agricultural complex, two Thermax 5G 6LH absorption chillers with a total capacity of 3.8 MW run on waste hot water. Heat is rejected by two NCT VR4 cooling towers.
The Vyborzhets mushroom complex in Vsevolozhsk gets its cooling from two Thermax 5G 6LH lithium bromide absorption chillers with a total capacity of 3.8 MW. They run on waste hot water, and heat is rejected by two NCT VR4 cooling towers. We carried out the design of the cooling system, supply, installation supervision and commissioning. The machines were delivered in 2018.
| Parameter | Data |
|---|---|
| Industry | Agriculture: full-cycle mushroom complex, more than 30,000 t of compost and up to 10,000 t of champignons per year |
| City | Vsevolozhsk, Leningrad Region |
| Generation | 4 GE Jenbacher gas engines, 3 MWM TCG 2032V16 gas engines, a hot water boiler for CO2 production |
| Heat | Waste hot water |
| Absorption chiller | 2 × Thermax 5G 6LH, 1.9 MW each, 12/6 °C water |
| Heat rejection | 2 NCT VR4 evaporative cooling towers |
| What the cooling is for | Air conditioning in the warm season |
| Our work | Cooling system design, supply, installation supervision, commissioning |
What was the task?
Cooling is needed for air conditioning in the warm season. The engineering logic is as follows: an energy center with seven gas engines and a boiler produces electricity and heat; in summer the heat is free, and it can be put to work making cooling instead of compressor chillers.
How does the scheme work?
Two heat sources: gas engines and a boiler house
The energy center has both engines and a boiler, and the machines run on waste hot water. The diagram shows the general case with two sources.
What was the result?
The complex got 3.8 MW of cooling from waste heat. The materials contain no further figures on the effect.
Photos of the facility







If you have a similar task, order a feasibility study or estimate the numbers in the calculator. Related page: greenhouses and agricultural complexes. How the machines work is described on the Thermax absorption chillers page; other examples are collected in the "Our projects" section, and there are many others.
Other projects

Tyumen, a 15-story Class A business center: a Thermax absorption chiller on hot water from gas engine waste heat, 12/7 °C…

Minsk, class B1 business center: a 500 kW Thermax LT 18C absorption chiller on heat from two Bosch gas engines, NCT cooling…

Moscow, a historic building: 5 Capstone C200 microturbines and 2 Thermax LT-14 C chillers of 500 kW, assembled from parts in the…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.