Omega Tower Business Center: Absorption Chiller on Heat from Two Bosch Gas Engines
In brief. In Minsk, a 500 kW Thermax LT 18C absorption chiller runs on heat from two Bosch gas engines and cools three buildings: the Omega Tower business center, a shopping mall and a fitness club.
In Minsk, the Omega Tower business center, the neighboring shopping mall and a fitness club get their cooling from one 500 kW Thermax LT 18C lithium bromide absorption chiller. It runs on hot water from two Bosch gas engine generator sets, and heat rejection is provided by an NCT cooling tower. The contract was signed in December 2016.
| Parameter | Data |
|---|---|
| Sector | Commercial real estate, class B1 business center with a floor area of 18,420 m² |
| City | Minsk, Belarus |
| Generation | 2 Bosch gas engines |
| Heat | Hot water from the gas engines |
| Absorption chiller | 1 × Thermax LT 18C, 500 kW, water 12/7 °C |
| Heat rejection | 1 NCT VR2 open wet cooling tower, NCT W0C chemical water treatment |
| What the cooling is for | Air conditioning of three buildings: the business center, the Globo shopping mall and the Adrenalin fitness club |
| Our work | Supply, installation supervision, commissioning |
What was the task?
Three buildings take cooling from one chiller plant. The engineering logic is this: the engines produce electricity and heat, and in summer this heat becomes cooling for all three buildings. The news item about the contract puts equipment localization, prices and schedules first.
How does the scheme work?
The classic: gas engine and hot-water absorption chiller
Hot water from the two engines goes to one LT 18C machine. A single-effect machine of this series gives a COP of 0.65–0.72: 500 kW of cooling needs about 700–770 kW of heat. The NCT cooling tower removes the machine's heat.
What was the result?
The contract was signed in December 2016 after more than a year of work on the project. The materials give no figures on the effect.
Site photos




If you have a similar task, order a feasibility study or rough out the figures in the calculator. Related pages: business centers and hotels and feasibility study for a business center. How the machines work is described on the Thermax absorption chiller page; other examples are collected in the "Our sites" section, and there are many others.
Other projects

Tyumen, a 15-story Class A business center: a Thermax absorption chiller on hot water from gas engine waste heat, 12/7 °C…

Moscow, a historic building: 5 Capstone C200 microturbines and 2 Thermax LT-14 C chillers of 500 kW, assembled from parts in the…

Pushkin, an API plant: 2 Jenbacher J320 gas engines and two 1,430 kW Thermax TAC L5 E3 absorption chillers, water 12/7 °C. In…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.