Aktivny Komponent pharmaceutical plant — cooling from gas engine heat

In brief. At an active pharmaceutical ingredients plant in Pushkin, two 1,430 kW Thermax TAC L5 E3 absorption chillers run on jacket water from two Jenbacher J320 gas engines. In operation since June 2020.

At the Aktivny Komponent pharmaceutical plant in Pushkin, two Thermax TAC L5 E3 lithium bromide absorption chillers of 1,430 kW each produce cooling from the heat of two Jenbacher J320 gas engine generator sets. We developed the working documentation, supplied the equipment, and carried out installation supervision and commissioning. The system has been in operation since June 2020.

Parameter Data
Industry Active pharmaceutical ingredients, 330 t per year, 13,000 m²
City Pushkin, Leningrad Region
Generation 2 Jenbacher J320 gas engines, TMM-TMVG.570 heat module
Heat Hot water from the gas engine jackets
Absorption chillers 2 × Thermax TAC L5 E3, 1,430 kW each, water 12/7 °C
Heat rejection 2 NCT VR3S cooling towers, 2 NCT W2C chemical water treatment units, 2 NCT pump stations
What the cooling is for Process lines and permanently occupied rooms
Our scope Working documentation (cooling supply, cooling supply controls, power equipment), supply, installation supervision, commissioning

What was the task?

Cooling is needed for the process lines and permanently occupied rooms. The equipment was ordered under an investment contract for new production and modernization; the cooling source here is the engine jacket water.

How does the scheme work?

The classic: gas engines and hot water absorption chillers

Jacket water from the two gas engines heats the absorption chiller circuit. The chillers produce 12/7 °C water, and NCT cooling towers reject the heat.

The engine jacket and exhaust heat exchanger heat water to about 90 °C. The water goes through a heat exchanger into a single-effect Thermax chiller with a COP of about 0.8. The chiller supplies 7/12 °C water to the consumer and rejects heat to an NCT cooling tower. Surplus heat is removed by dump radiators.

What was the result?

The system has been in operation since June 2020; the absorption chillers were delivered in 2019. The materials give no figures on the effect.

Project photos

The plant building, ventilation ducts on the facade
The plant building, ventilation ducts on the facade
Water treatment chemical dosing unit
Water treatment chemical dosing unit
Absorption chiller and piping in the machine room
Absorption chiller and piping in the machine room
Pumps and piping
Pumps and piping
Two cooling towers on a steel frame
Two cooling towers on a steel frame
Gas engine units on an outdoor site
Gas engine units on an outdoor site
Cooling tower on a frame with a ladder
Cooling tower on a frame with a ladder
Pump skid in the machine room
Pump skid in the machine room
Piping in the machine room
Piping in the machine room
Pump and heat exchanger assembly
Pump and heat exchanger assembly
Gas engine site with exhaust stacks
Gas engine site with exhaust stacks

If you have a similar task, order a feasibility study or estimate the numbers in the calculator. Related pages: pharmaceuticals and feasibility study for pharmaceutical production. The chiller design is described on the Thermax absorption chillers page, and other examples are collected in the "Our projects" section, along with many others.

What our customers say

150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.

All references and letters All projects

Let us calculate trigeneration for your site

An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.