Mikran: trigeneration at an electronics plant
In brief. At the Mikran plant in Tomsk, two Thermax 5G 4L C absorption chillers of 1,100 kW each run on the waste heat of a 1.7 MW gas engine. In a letter, the owner noted delivery a month ahead of schedule.
The Mikran radio electronic equipment plant in Tomsk got an energy center operating in trigeneration (CCHP) mode: a 1.7 MW gas engine generator set and two Thermax 5G 4L C lithium bromide absorption chillers of 1,100 kW each. We supplied the machines and carried out installation supervision and commissioning. The plant was officially opened in November 2014.
| Parameter | Data |
|---|---|
| Industry | Radio electronics: telecommunications, microwave, radar |
| City | Tomsk |
| Generation | Gas engine, 1.7 MWe |
| Heat | Gas engine waste heat, hot water |
| Absorption chiller | 2 × Thermax 5G 4L C, 1,100 kW each, 12/7 °C water |
| Heat rejection | 2 wet open cooling towers |
| What the cooling is for | Plant air conditioning |
| Our work | Supply, installation supervision, commissioning |
What was the task?
The customer set strict reliability requirements. In summer the gas engine heat has nowhere to go, so it is used to make cooling for air conditioning.
How does the scheme work?
The classic: gas engine and a hot water absorption chiller
Hot water from the engine goes to single-effect Thermax machines, and 12/7 °C water goes to the plant's systems. Cooling towers reject the machines' heat.
What was difficult?
The main difficulty was coordinating the gas engine plant and the absorption chillers in the transition period and at low load: at low load the engine gives less heat, and the machine may not get enough. How this was solved is not described in the sources. The machine tubes are made of SS 430 Ti stainless steel instead of copper; the absorption chiller service life in the manufacturer's catalog is 20–25 years.
What was the result?
In a letter dated 15 October 2014, the owner of the energy center thanks us for delivering two Thermax absorption chillers and two cooling towers a full month ahead of schedule, despite a cargo delay caused by sanctions.
Photos of the facility








Customer letter

Letter of 15 October 2014, ref. No. 6200/k.
If you have a similar task, order a feasibility study or estimate the numbers in the calculator. Related page: industry and power generation. How the machines work is described on the Thermax absorption chillers page; other examples are collected in the "Our projects" section, and there are many others.
Other projects

Tyumen, a 15-story Class A business center: a Thermax absorption chiller on hot water from gas engine waste heat, 12/7 °C…

Minsk, class B1 business center: a 500 kW Thermax LT 18C absorption chiller on heat from two Bosch gas engines, NCT cooling…

Moscow, a historic building: 5 Capstone C200 microturbines and 2 Thermax LT-14 C chillers of 500 kW, assembled from parts in the…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.