Moscow Region Government House — an example of Thermax chillers, a project completed without Cold Energy's involvement
In brief. This project was completed without Cold Energy's involvement; we show it as an example of Thermax chillers in operation. Three LT 42 T absorption chillers running on heat from four Jenbacher gas engines with 12 MWe have been operating since 2006.
The Moscow Region Government House was completed without the involvement of Cold Energy (NCT). The project is old, has no connection with us, and we show it only as an example of Thermax chillers in operation. In Krasnogorsk, cooling for the air conditioning of the administrative complex is produced by three Thermax LT 42 T lithium bromide absorption chillers running on hot water from four Jenbacher JMS 620 gas engine generator sets and exhaust heat exchangers; the plant's electrical capacity is 12 MW. The chillers have been operating here since 2006; our company started work later, in 2011.
| Parameter | Data |
|---|---|
| Industry | Government administrative complex |
| City | Krasnogorsk, Moscow Region |
| Generation | 4 Jenbacher JMS 620 GS-N.LC gas engines, 12 MWe |
| Heat | Hot water from the gas engines and exhaust heat exchangers |
| Absorption chillers | 3 × Thermax LT 42 T, water 12/7 °C |
| Heat rejection | 2 closed-circuit evaporative cooling towers |
| What the cooling is for | Central air conditioning of the building |
| Cold Energy's involvement | None, the project is shown as an example |
What was the task?
The sources do not describe the task; the engineering logic is as follows. A 30-hectare administrative complex needs air conditioning throughout the warm season, and in summer the heat from the four-engine plant is available. The absorption chillers use this heat instead of adding the electrical load of chillers.
How does the scheme work?
The classic: gas engines and hot water absorption chillers
Hot water from the engines and exhaust heat exchangers is supplied to three absorption chillers. Each delivers 12/7 °C water to the building network. The heat the chillers reject during operation is removed by closed-circuit cooling towers.
Project photos



If you have a similar task, order a feasibility study or estimate the numbers in the calculator. Related page: business centers and hotels. The chiller design is described on the Thermax absorption chillers page, and the projects we completed ourselves are collected in the "Our projects" section, along with many others.
Other projects

Tyumen, a 15-story Class A business center: a Thermax absorption chiller on hot water from gas engine waste heat, 12/7 °C…

Minsk, class B1 business center: a 500 kW Thermax LT 18C absorption chiller on heat from two Bosch gas engines, NCT cooling…

Moscow, a historic building: 5 Capstone C200 microturbines and 2 Thermax LT-14 C chillers of 500 kW, assembled from parts in the…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.