Teplichnoye Greenhouse Complex: Cooling from Gas Engine Heat
In brief. At a greenhouse complex in the village of Sadovy, two 400 kW Thermax LT 12 C absorption chillers supply water at 8.5/3.5 °C from gas engine and boiler house heat. The complex's energy efficiency is up to 92 %, payback 5 years.
The AO Teplichnoye greenhouse complex in the village of Sadovy got cooling from the heat of its own power plant. Two 400 kW Thermax LT 12 C lithium bromide absorption chillers run on hot water from gas engine generator sets and a boiler house and supply water at 8.5/3.5 °C. This is the first trigeneration (CCHP) for a greenhouse complex in Russia.
| Parameter | Data |
|---|---|
| Sector | Greenhouse complex, protected-ground vegetables, three greenhouse blocks |
| City | Village of Sadovy, Sverdlovsk Region |
| Generation | 10 JMS 624 and 4 JMC 320 gas engines, island operation, no external grid |
| Heat | Waste hot water from the gas engines and boiler house, +90/+80 °C by design |
| Absorption chiller | 2 × Thermax LT 12 C, 400 kW each, water 8.5/3.5 °C |
| Heat rejection | 2 NCT VR series cooling towers, NCT chemical water treatment |
| What the cooling is for | Air conditioning of the packing area, cold rooms and the administrative building |
| Our work | Design and detailed documentation, supply, installation supervision, commissioning |
What was the task?
The complex's power plant runs in island mode: the substation is far away, and there is not enough electrical capacity or reserve. An electric chiller did not fit within the available capacity. Cooling is needed for packing, storage and the administrative building, so it is made from waste hot water from the engines and the boiler house.
How does the scheme work?
Greenhouse complex: carbon dioxide as well
A typical greenhouse energy center: the engine gives electricity, and the heat goes to heating and to the absorption machine. At Teplichnoye, the machines cover the cooling for packing and storage.
What was difficult?
The customer required +3.5 °C at the outlet: the packing area needs +12 °C. At the same time, the chiller plant runs without permanent staff. The machines were ordered for this mode, and the controls were built on freely programmable controllers, with remote monitoring and internet access. For the complex layout of the storage rooms, the cold air flow was optimized so that the temperature is even throughout the room.
What was the result?
The complex's energy efficiency is up to 92 %, and the payback period is 5 years. Delivery of the absorption chillers was completed in April 2018, and the NCT cooling towers were shipped in early 2018. The work was carried out under five contracts with one contractor, without subcontractors.
Site photos

If you have a similar task, order a feasibility study or rough out the figures in the calculator. Related pages: greenhouses and feasibility study for a greenhouse. How the machines work is described on the Thermax absorption chiller page; other examples are collected in the "Our sites" section, and there are many others.
Other projects

Tyumen, a 15-story Class A business center: a Thermax absorption chiller on hot water from gas engine waste heat, 12/7 °C…

Minsk, class B1 business center: a 500 kW Thermax LT 18C absorption chiller on heat from two Bosch gas engines, NCT cooling…

Moscow, a historic building: 5 Capstone C200 microturbines and 2 Thermax LT-14 C chillers of 500 kW, assembled from parts in the…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.