Smolensk Academy of Physical Culture — two 1,100 kW absorption chillers
In brief. At the Smolensk State Academy of Physical Culture, Sport and Tourism, two 1,100 kW Thermax 5G 4L C absorption chillers run on hot water from the boiler house. There are four MTU gas engines on site.
At the Smolensk State Academy of Physical Culture, Sport and Tourism, cooling is provided by two Thermax 5G 4L C lithium bromide absorption chillers of 1,100 kW each. They run on hot water from the academy's own boiler house. The contract was signed in March 2013, and the equipment was delivered in January 2014.
| Parameter | Data |
|---|---|
| Industry | Sport and education: 4 academic buildings, 11 halls, a stadium |
| City | Smolensk |
| Generation | 4 MTU 8V4000L62 gas engines (3.1 MWe), 2 hot water boilers, a diesel generator |
| Heat | Hot water from the academy's boiler house |
| Absorption chillers | 2 × Thermax 5G 4L C, 1,100 kW each, water 12/7 °C |
| Heat rejection | Not stated in open sources |
| What the cooling is for | Cooling supply for the sports facilities |
| Our scope | Supply, installation supervision, commissioning |
What was the task?
The academy's sports facilities need cooling, and its own boiler house supplies hot water. The engineering logic is simple: cooling is produced from this water instead of from electricity.
How does the scheme work?
Hot water from the boiler house
The site has both gas engines and a boiler house. The diagram shows the general case with both sources, while the academy's chillers, according to the sources, run on hot water from the boiler house.
What was the result?
Cooling is produced from the boiler house hot water. The materials give no figures on the effect.
Project photos




If you have a similar task, order a feasibility study or estimate the numbers in the calculator. Related page: gas engines. The chiller design is described on the Thermax absorption chillers page, and other examples are collected in the "Our projects" section, along with many others.
Other projects

Tyumen, a 15-story Class A business center: a Thermax absorption chiller on hot water from gas engine waste heat, 12/7 °C…

Minsk, class B1 business center: a 500 kW Thermax LT 18C absorption chiller on heat from two Bosch gas engines, NCT cooling…

Moscow, a historic building: 5 Capstone C200 microturbines and 2 Thermax LT-14 C chillers of 500 kW, assembled from parts in the…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.