Zydus Cadila, India
In brief. Three 1 MW Jenbacher engines and three Thermax machines give a pharmaceutical plant 3,058 kW of process and air-conditioning cooling.
The Zydus Cadila pharmaceutical plant gets its electricity from three GE Jenbacher engines, and their exhaust and jacket heat drive three Thermax absorption machines. The source notes lower operating costs and uninterrupted power supply.
What does the project consist of?
| Parameter | Value |
|---|---|
| Sector | Pharmaceuticals |
| Engines | 3 GE Jenbacher engines, 1 MW each |
| Fuel | Natural gas |
| Heat for the machine | Exhaust at 427 °C and jacket at 87 °C |
| Machine and cooling | 3 machines of 1,020 kW (290 TR) each, 3,058 kW (870 TR) in total |
| What the cooling is for | Process and air-conditioning cooling |
Why is this example useful for a Russian site?
One machine per engine, 3 by 3. Losing one engine takes away a third of the electricity and cooling at once, so for process cooling the backup is sized for exactly that third, with grid supply and a chiller planned in advance. The roughly 30 minutes a machine needs to reach operating mode is also covered by the backup. More: trigeneration for pharmaceuticals.
How does this kind of scheme work?
The machine takes the engine exhaust and the jacket hot water directly and needs no separate heat exchangers.
Based on Thermax materials
Other projects worldwide

AT&S in Shanghai: one 1.1 MW engine and one Thermax absorption chiller give 1,160 kW of cooling in summer and 80 °C hot water in…

Berlin Airport: two Thermax chillers on engine exhaust give 2,600 kW of air conditioning cooling. A trigeneration case with…

Brevoort East residential building in New York: two Tecogen engines and a 280 kW Thermax machine that kept running through…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.