Data Center, Syracuse University, USA

In brief. The exhaust of 12 Capstone microturbines drives two 1,125 kW Thermax machines and cools the server hall with 7 °C water.

The IBM data center at Syracuse University is powered by 12 Capstone microturbines. The 309 °C exhaust goes to two Thermax absorption chillers, which cool the servers with 7 °C water and also serve a neighboring office. According to the source, the turbines fully cover the data center's energy needs.

What does the project consist of?

Parameter Value
Industry Data center
Engines 12 Capstone C65 microturbines of 65 kW each
Fuel Natural gas
Heat for the machine Exhaust at 309 °C
Machine and cooling 2 exhaust-fired machines of 160 TR each, 1,125 kW (320 TR) in total
What the cooling is for Server cooling (7 °C water), heating and cooling for the neighboring office

Why is this example useful for a Russian site?

Microturbine exhaust is only 309 °C, below the 350–600 °C that is standard for exhaust-fired machines. For a heat source like this, the machine is ordered in a special design rated from 270 °C. On the other hand, servers need cooling in winter too, so the heat is used without seasonal downtime. More: data center cooling with trigeneration (CCHP).

How does this kind of scheme work?

The exhaust of several microturbines is collected in a common header and goes to the machines.

Several microturbines produce electricity; their exhaust is collected in a common header and goes into an exhaust-fired Thermax chiller. The scheme is used in buildings and data centers.

Based on Thermax materials

What our customers say

150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.

All references and letters All projects

Let us calculate trigeneration for your site

An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.

Get a feasibility study