Sanjiban Hospital near Kolkata, India
In brief. Six engines running on gas from wood gasifiers send their heat to two Thermax chillers, and 1,300 kW of cooling covers a 300-bed hospital.

A 300-bed hospital near Kolkata is supplied by six 250 kW engines that run on gas from wood gasifiers. The exhaust and jacket water drive two Thermax absorption chillers. Surplus electricity is sold to the grid, and the project received a government ministry subsidy.
What does the project consist of?
| Parameter | Value |
|---|---|
| Industry | Healthcare, 300-bed hospital |
| Engines | 6 engines, 250 kW each |
| Fuel | Gas from wood gasifiers (wood chips, sawdust) |
| Heat for the chiller | Exhaust at 480 °C and jacket water at 89 °C |
| Chiller and cooling | 2 chillers of 185 TR each, 1,300 kW (370 TR) in total |
| What the cooling is for | Hospital air conditioning |
Why is this example useful for a Russian site?
Gas from wood chips and sawdust gives 480 °C exhaust and 89 °C jacket water: these are normal conditions for the chiller, and selection works the same way as for natural gas. Six 250 kW engines give 1,300 kW of cooling. Here the economics were supported by the subsidy and the sale of surplus power to the grid. Without them, as in our feasibility study models, the calculation will be different. More: biogas, coal mine gas and associated petroleum gas.
How does this kind of scheme work?
Gas from the gasifiers fuels the engines, and their heat is turned into cooling.
Based on Thermax materials
Other projects worldwide

AT&S in Shanghai: one 1.1 MW engine and one Thermax absorption chiller give 1,160 kW of cooling in summer and 80 °C hot water in…

Berlin Airport: two Thermax chillers on engine exhaust give 2,600 kW of air conditioning cooling. A trigeneration case with…

Brevoort East residential building in New York: two Tecogen engines and a 280 kW Thermax machine that kept running through…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.