Paramount Pictures, Los Angeles, USA
In brief. Four 250 kW microturbines heat water, and one Thermax machine turns it into about 800 kW of cooling for the studio offices.
The Paramount Pictures offices get their electricity from four 250 kW Flex Energy microturbines. Hot water from their exhaust drives one 230 TR Thermax absorption machine. According to the case study, the savings are 550,000 kWh per year.
What does the project consist of?
| Parameter | Value |
|---|---|
| Sector | Film studio, offices |
| Engines | 4 Flex Energy microturbines, 250 kW each |
| Fuel | Natural gas |
| Heat for the machine | Hot water from the exhaust, cooled from 90.5 to 73.2 °C |
| Machine and cooling | 1 machine, about 800 kW (230 TR) |
| What the cooling is for | Office air conditioning |
Why is this example useful for a Russian site?
About 800 kW of cooling from 1,000 kW of electrical capacity: 0.8 kW of cooling per kW of electricity via hot water. Water at 90.5/73.2 °C gives a 17 K difference, so the heating water flow is small. This benchmark works for a first estimate on microturbines; after that, the calculation is done from the datasheet. More: trigeneration on microturbines.
How does this kind of scheme work?
In the diagram, the microturbine exhausts are collected in a common header and go straight to the machine; in Los Angeles their heat first heats water.
Based on Thermax materials
Other projects worldwide

AT&S in Shanghai: one 1.1 MW engine and one Thermax absorption chiller give 1,160 kW of cooling in summer and 80 °C hot water in…

Berlin Airport: two Thermax chillers on engine exhaust give 2,600 kW of air conditioning cooling. A trigeneration case with…

Brevoort East residential building in New York: two Tecogen engines and a 280 kW Thermax machine that kept running through…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.