In brief. Two Thermax chillers take heat from the 533 °C exhaust and 92 °C jacket water of Deutz engines and give the mall 2,918 kW of cooling.

At Pacific Mall, 2.7 MW of Deutz engines supply the building with electricity, and the exhaust and jacket heat goes to two Thermax absorption chillers. The source describes the cooling as practically free and the capital costs as lower.
What does the project consist of?
| Parameter | Value |
|---|---|
| Industry | Shopping mall |
| Engines | Deutz gas engines, 2.7 MW |
| Fuel | Not specified |
| Heat for the chiller | Exhaust at 533 °C and jacket water at 92 °C |
| Chillers and cooling | 2 chillers of 415 TR each, 2,918 kW (830 TR) in total |
| What the cooling is for | Air conditioning of a 500,000 sq ft shopping mall |
Why is this example useful for a Russian site?
2.7 MW of engines yield 2,918 kW of cooling, more than 1 kW per kW of electricity, because the chiller takes both the exhaust and the jacket water. Such cooling stays "practically free" only while the engine is loaded. In a Russian calculation the main savings still come from generating your own electricity, and the cooling puts the heat to use in summer. More: trigeneration (CCHP) for shopping malls.
How does this kind of scheme work?
The chiller takes the exhaust and the engine jacket hot water at the same time and needs no separate heat exchangers.
Based on Thermax materials
Other projects worldwide

AT&S in Shanghai: one 1.1 MW engine and one Thermax absorption chiller give 1,160 kW of cooling in summer and 80 °C hot water in…

Berlin Airport: two Thermax chillers on engine exhaust give 2,600 kW of air conditioning cooling. A trigeneration case with…

Brevoort East residential building in New York: two Tecogen engines and a 280 kW Thermax machine that kept running through…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.