101 Miller Street, North Sydney, Australia

In brief. Exhaust from MTU engines at 454 °C gives 1,500 kW of cooling to offices and shops in Sydney; greenhouse gas emissions are about half as high.

101 Miller Street, North Sydney, Australia

The office complex at 101 Miller Street in North Sydney is powered by two MTU engines. Exhaust at 454 °C goes to Thermax absorption chillers with a total capacity of 1,500 kW. According to the source, greenhouse gas emissions fell by about half, and the building received 5 Star NABERS and 5 Star Green Star ratings.

What does the project consist of?

Parameter Value
Industry Commercial real estate
Engines 2 MTU engines of 1,166 kW each
Fuel Natural gas
Heat for the chiller Exhaust at 454 °C
Chillers and cooling Exhaust-fired, 1,500 kW (426 TR) in total
What the cooling is for Air conditioning of 40,000 m² of offices and 10,000 m² of shops

Why is this example useful for a Russian site?

The chillers take only the exhaust, so two engines of 1,166 kW each give 1,500 kW of cooling, about 0.64 kW per kW of electricity. In schemes with exhaust and jacket water, the same figure is about 1. If the jacket water is not used for cooling, its heat needs another consumer. More: trigeneration for business centers and hotels.

How does this kind of scheme work?

Engine exhaust goes straight into the absorption chiller, which supplies chilled water to the building.

Exhaust gas goes through a diverter damper straight into a double-effect Thermax chiller with a COP of about 1.4. When cooling is not needed, the damper sends the gas to the bypass. Hot water from the engine jacket goes to space heating.

Based on Thermax materials

What our customers say

150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.

All references and letters All projects

Let us calculate trigeneration for your site

An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.

Get a feasibility study