HuaiNan (Panyi) Coal Mine, China
In brief. Coal mine methane fuels two Deutz engines, and their exhaust and jacket heat becomes 3,023 kW of cooling for the mine at 1,000 m.

At the HuaiNan coal mine, two 1.4 MW Deutz engines run on coal mine methane. All of the exhaust and jacket heat goes to a single 3,023 kW Thermax absorption chiller, which air-conditions the mine at a depth of 1,000 m.
What does the project consist of?
| Parameter | Value |
|---|---|
| Industry | Coal mining |
| Engines | 2 Deutz engines, 1.4 MW each |
| Fuel | Coal mine methane |
| Heat for the chiller | Exhaust at 525 °C and jacket water at 85 °C |
| Chillers and cooling | 1 chiller, 3,023 kW (860 TR) |
| What the cooling is for | Air conditioning of the mine at a depth of 1,000 m |
Why is this example useful for a Russian site?
Exhaust and jacket heat from two 1.4 MW engines give 3,023 kW of cooling. If the chiller sits on the surface and the cooling is needed at a depth of 1,000 m, the water column creates about 100 bar, while the chiller is rated for 8 kgf/cm². The circuits must be separated by a heat exchanger. For a Russian mine this is the first check, even before the methane calculation. More: biogas, coal mine gas and associated petroleum gas.
How does this kind of scheme work?
Mine gas fuels the engine, and its heat is turned into cooling.
Based on Thermax materials
Other projects worldwide

AT&S in Shanghai: one 1.1 MW engine and one Thermax absorption chiller give 1,160 kW of cooling in summer and 80 °C hot water in…

Berlin Airport: two Thermax chillers on engine exhaust give 2,600 kW of air conditioning cooling. A trigeneration case with…

Brevoort East residential building in New York: two Tecogen engines and a 280 kW Thermax machine that kept running through…
What our customers say
150 letters of thanks · 350+ major projects · 1,000+ customers · in business since 2011. These are real letters from customers; many others are on the references page.
Let us calculate trigeneration for your site
An engineer will put together the scheme and select the equipment, and you get a feasibility study. Free of charge, no obligation.